#21/2302/2303
CRPO # 83 - LTA For Zulf AH East Oil Facilities (Pkg 5)
- Theme
- Offshore
- Client
- Saudi Aramco, Saudi Arabia
- Status
- Ongoing
- Contract Type
- EPC
Scope Of Work
Engineering, Procurement, Fabrication, Transportation and Installation of Offshore Facilities:
- 2 Nos. Tie-in Platforms and 2 Nos. six legged Jackets
- 11 Nos. Oil Wellhead Topsides
- 9 Nos. Subsea Valve Skids
- 11 segments 15kV Subsea Composite Cable (55.7 Kms.)
- 7 segments Subsea Pipelines (60 Kms.)
- 6 segments Subsea Flexible Pipelines (4.3 Kms.)
- 9 Nos. Subsea Umbilicals (2.3 Kms.)